  • Initial Contracted Total: $161,998.20
  • Change Orders: $8,592.28

    • Credits & Overages, TV mounting, recessed can light retrofit, additional plumbing, extending a coat closet, replacing patio exterior door & recessed floor registers
    • Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.

  • Project Total: $170,590.48
  • Time To Complete 12 weeks

Summary:

This kitchen underwent many changes in order to accommodate the new placement of appliances and workflow of the space. The major changes included removal of the existing soffit, which encompassed the majority of the kitchen’s footprint. With many of the appliances changing locations, new mechanicals were run to accommodate the new placements. This also entailed removal of the back door and replacing it with a single exterior door to accept the new refrigerator location. This space was beautifully curated by Rachel Henry from Sanctuary Designs. Her choice of finishes such as tile, counters, cabinetry & layout transformed this space into the gathering place of the home.

See the Transformation

2-min3-min

Key Features

Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.
Credits & Overages, Retrofitting dated can lighting for recessed dimmable LED can lighting, additional plumbing for future bathroom project, replacing exterior patio door, installing TV mounts & replacing a laundry door.

Before:

After:

Challenges & Solutions

Challenges & Solutions

Soffit Removal & Mechanical Re-routing

Soffit Removal & Mechanical Re-routing

Challenge:

The removal of soffit is often our most anticipated challenge, more often than not contractors will utilize soffits to hide or run mechanicals to utilities or other areas of the house.

Solution:

We anticipated removing old stereo speakers in the soffit and only had a few minor mechanicals that needed tucking into the ceiling. No additional time was taken on this phase.

Too Few Lights & Too Many Switches

Challenge:

Prior to the project starting the homeowner informed us of some electrical gremlins. Two hall lights controlled by multiple switches that needed to be addressed.

Solution:

After nearly a day of troubleshooting and eliminating some unnecessary 3-way switches, our team was able to sort the issue swiftly.

What to Expect

1

Design Phase

This project was designed by Rachel Henry of Sanctuary Designs. Rachel worked closely with the client and worked through the overall floor plan, material selections, tile pattern, color palettes & textures that make this space complete.

2

Project Planning

During the design phase, we worked with Rachel & the client to establish a realistic budget for the project, timeframe, start date and more. Once the designs were completed, selections were made we had all the information to present a formal proposal.

3

Customer Onboarding

The customer is given access to Buildertrend, a platform where we manage all of our projects, providing the customer with daily updates for completed phases, submit change orders, secured payments & more.

4

Project Preparation:

With the designs confirmed, selections made, budget set, time frame arranged & signed project proposal it was time to get started. With all material selections made, ordering was made easy. We ordered all the materials directly to our shop in preparation for the project start date and ensured all items were indeed correct and intact. Just one damaged item could have caused unnecessary lead time.

Project Start & Phases

Phase 1

Demolition & Rough-in Mechanicals

Phase 2

Framing & Drywall

Phase 3

Painting

Phase 4

Setting cabinets & Countertop Template

Phase 5

Counter install & Tile Backsplash

Phase 6

Finish Electrical & Finish Plumbing

Phase 7

Punch Out

Phase 8

Hardwood Refinishing

Final Phase

Project Completion & Walk-through

Project Final Review & Photos:

A month later we scheduled a site visit for a final review, address any minor items the customer might have discovered & perform the project completing photos.

Materials & Fixtures

Cabinets & Counters

Mid - Level Cabinetry

Mid - Level Cabinetry

Yorktowne Custom Cabinets, Holton full overlay, dovetail drawers with soft-close door & drawer glides
Mid - Level Countertop

Mid - Level Countertop

MSI Soapstone Metropolis Quartz

Plumbing Fixtures

Mid - Level Faucet Fixture

Delta Trinsic Pull-down Faucet
High - Level Sink

High - Level Sink

Blanco Ikron 33” Farmhouse Silgranit Sink

Electrical Fixtures

High - Level Pendant Lighting

High - Level Pendant Lighting

Serena & Lily Knolls Concrete Pendant 12”

Tile

Mid - Level Backsplash Tile

Mid - Level Backsplash Tile

Luna Arc, White

Fireplace Surround & Hearth

Mid - Level Quartz Surround

“Soapstone Mist” quartz surround, by MSI
Hearth

Hearth

Fabricated by Vision Construction craftsmen

Refinishing Hardwood

Hardwood Refinishing Performed by Totally Floored, a Vision Construction trusted vendor.

Get Your Instant Remodeling Quote!

Ready to transform your home? Get a quote on any of the of the following remodels: